181 results found for "LED"
Glass panels The Diamond (Heineken Corner) installed
...The Diamond in Amsterdam have been installed. As the panels are all placed at an angle it ... iconic building its unique look.
We installed the more than 800 triangular glass panels. ... steel outriggers (swords) at the top and so-called nesting boxes (steel consoles in the concrete ...
Bridge Operator House Installed
...Roller' bridge in Haarlem has been installed. Surrounded by the press architect Thijs ...
Victoria & Albert Museum Exhibition Road
...red lacquered closed elements; the so called vitrines. The rhombus shaped glazing, ... welding had created in the surface of the assembled balustrade. The curved mirror elements were ... paint shop. In the pre-tender phase it was acknowledged that the V-shaped vitrines were not ...
Parametric design
...Octatube are happy to take on. In fact, it has led us to develop new smart ... The often unique elements can then be modelled per project. Within Octatube, Inventor, an ... of unique elements and connections could be modelled 1 by 1. If the grid would change at any time, ...
Refurbishment Channel 4 façade
...and structure condition assessments revealed that any refurbishment strategy would require ... appraisal, planning and collaboration enabled a minimal carbon approach by reusing material ... system contribute to this.
Before we dismantled façade, we placed additional safety ...
P.C. Hooftstraat 138
...architecture.
The P.C. Hooftstraat, nestled in Amsterdam's Museum ... strength, the façade uses low-iron, annealed and laminated glass with a SGP interlayer. ... to ensure the stability.
The precisely detailed glass joints are fully bonded using ...
Paperdome
...the Paperdome has recently been reassembled for the third time. This dome structure is ... dome was produced within seven weeks and assembled for the first time in IJburg (Amsterdam), ... weeks. After this period, the dome was dismantled. A year later, in 2004, Octatube reassembled ...
New Build Octatube
...ensure that all rooms in the office can be cooled and heated. There is CO2 controlled ... low heat load. Floor heating/cooling is installed in the production hall and skylights with ... future, they all have the same equipment installed, such as an overhead ...
